1.开车前应先检查冲剪机传动部件和各部连接螺丝、销轴是否松动。电器接地是否完好。
1. before driving, check the transmission parts of the punching shear machine and the screws of each department, and whether the pin shaft is loose. The electrical grounding is intact.
2.工作前要对各部润滑,开车试转二至三分钟,无问题方可投入工作。
2. before working, you should lubricate the departments and drive for two to three minutes.
3.不准超负荷,淬火钢材严禁冲剪。
3. no overload. Hardened steel is strictly prohibited.
4.工作时应戴好手套和穿戴好劳动保护用品,严禁穿凉鞋和拖鞋。
4. gloves should be worn and protective clothing should be worn while working. No sandals and slippers are strictly prohibited.
5.冲剪时要经常给冲具加油,严防上下冲具歪斜。
When 5. punching and shearing, you should always add fuel to the punching tools, and strictly prevent the upper and lower punching tools from being skewed.
6.送料时要注意手指安全,特别当板料冲到最后压脚压不上板料时,禁止冲剪。
6. Pay attention to finger safety when feeding, especially when the sheet metal punched to the last press foot can not press the sheet metal, forbid punching and shearing.
7.开车时严禁拆装、校对剪刃和冲模。不准用力敲打冲模、剪刃和其他机件。
7. it is strictly prohibited to disassemble and assemble, proofread the blade and die. It is not allowed to pound the die, blade and other parts vigorously.
8.严格控制板料的规格范围,超出时严禁冲剪。
8. strictly control the specification of sheet metal, and cut off when it is out of order.
9.工作场所不得堆积其他物品和大量的冲料,调整和清扫时必须停车。
9. no other articles and large quantities of materials should be accumulated in the workplace.
10.工作完毕,及时停机、断电,清理现场。